Technical Note: Oil Spill Deployment Protocols for SBE 25 and 25plus CTD

Publication Date: 
Thursday, June 3, 2010
AttachmentSize
SBE25_OilSpillDeploymentProtocols.pdf35.48 KB

Note: This protocol was written for the SBE 25. Protocol is similar for the SBE 25plus, but commands are different (SetMinCondFreq= to set the minimum conductivity frequency; SetPumpDelay= to set the pump delay); see the SBE 25plus manual for command details.

Applies To